History
Indian Pacific
Although the original Indian Pacific can be traced back to the early 1900s, it was not until 1970 that the train completed its first unbroken journey from Sydney to Perth.
As the colonies of Australia were headed towards federation at the end of the 19th Century, the colony of Western Australia was lured to join this new nation by promise of a transcontinental railway, linking this isolated western region with the rest of the eastern colonies.
A skeleton rail link extended from the east to the west coasts of Australia except for a 1,996 kilometre gap in the system between Kalgoorlie in Western Australia and Port Augusta in South Australia. On 17 October, 1917, in a remarkable surveying and engineering feat, two construction teams, one starting from Port Augusta and the other from Kalgoorlie, made a historic achievement, meeting to join the lines at what is now the tiny South Australian siding of Ooldea on the Nullarbor Plain. This was the longest railway ever built as a single project in Australia, taking five years to complete. It was constructed using the most basic tools – pick and shovel, carthorse and camel.
At 10.15 am on 25 October, 1917, the first eastbound passenger train, the Transcontinental Express, departed Kalgoorlie for Port Augusta. The different rail gauges required guests required guests to change trains several times along the journey.
A standard trip from Sydney to Perth comprised of: Sydney to Albury on a standard gauge track, change trains at Albury to travel to Melbourne on broad gauge through to Port Pirie, change trains in Port Pirie for the short journey into Port Augusta and then on to Kalgoorlie on standard gauge, then change trains in Kalgoorlie for the narrow gauge journey in Perth.
It was not until 1969 that an uninterrupted rail link from the Pacific Ocean in the east to the Indian Ocean in the west existed. The first unbroken journey of the new Indian Pacific commenced from Sydney Central Station on Monday 23 February, 1970, arriving in Perth to a crowd of over 10,000 on 27 February.
It is this rich history that has made the Indian Pacific one of Australia’s most treasured icons.
The diversity of the Australian landscape that can be viewed on this remarkable 4,352 kilometre transcontinental journey and the wonderful hospitality afforded to guests aboard the train, makes the Indian Pacific one of the world’s greatest train journeys.
The Journey
Sydney to Perth via Adelaide or return three nights and three days one way
Length of journey
65 hours
Sydney to Perth – 4,352 km
Average speed of train
85km/hour (max speed 115km/hour)
Symbol
The symbol of the Indian Pacific is the wedge-tail eagle, Australia’s largest eagle. Its massive two metre wingspan symbolises the epic journey of the Indian Pacific, the adventure that spans the continent.
Total number of carriages
Single 15 Double 25
Plus locomotive and motorail
Average length of train (metres)
Single 427 Double 711
Includes 2 locomotives and motorail
Average weight of train (tonnes)
Single 796 Double 1375
Excluding locomotive
(Single consist is the minimum trains size. Most of Indian Pacific services operate as doubles).